APPLICATIONS

Shenzhen Metro

Project Time: 2017Project Category: Government Department
Product Application: fire-resistant cable, super five network cable, large logarithmic communication cable and other integrated wiring products
Project Location: Shenzhen

Project Introduction:
The first phase of the Shenzhen Metro project consists of two parts: the planned eastern section of Line 1 and the southern section of Line 4. The total length of the line is 21.866 kilometers and the total investment is 11.55 billion yuan. The main projects include: East Section of Line 1: including Luohu, Guomao, Laojie, Grand Theatre, Science Museum, Huaqiang Road, Gangxia, Convention and Exhibition Center (transportation stations of Lines 1 and 4), shopping park, Xiangmihu, There are 15 stations in Chegongmiao, Zhuzilin, Qiaocheng East, OCT and Window of the World. The line starts from the front square of Luohu Railway Station and goes north along Renmin South Road via Guomao to Jiefang Road. It turns westward to Jiefang Road and Shennan Middle Road to Futian Road. It turns southwest to Fuhua Road and turns west along Fuhua Road to Xinzhou Road. Shennan Avenue, through the Xiangmi Lake, Chegong Temple, Zhuzilin, Qiaocheng East, OCT to the window of the world, the line is 17.119 pairs of positive line kilometers. The southern section of Line 4: including Huanggang, Fumin, Convention and Exhibition Center (transportation stations of Lines 1 and 4), Civic Center and 5 stations of Children's Palace. The line starts from Huanggang Sand Dock, and after crossing the Guangzhou-Shenzhen Expressway Bridge, it goes north along Jintian South Road to Binhe Avenue and turns to Center 2nd Road. It exchanges with Line 1 at the Convention and Exhibition Center Station, and then along the planned Pengcheng Road at least the New Year Palace. The total length of the line is 4.479 pairs of positive lines. In addition, the Zhuzilin depot has a 1.296 single-line-km line, and the north-west line of Line 1 and Line 4 is 0.447. There are 20 stations in the whole line, including 19 underground stations and 1 ground station. There is also a bamboo forest depot and control center, and a main substation.

Applications:
Mainly use fire-resistant cable, super five network cable, large logarithmic communication cable and other integrated wiring products. WDZ-AVPV 7×0.2. WDZ-SYV 50-7-2; WDZ-RVVB 2×1.5mm2; super five types of 4 pairs of twisted pairs; WDZ-AVPV 2×0.75mm2; WDZ-AVPV 2×0.35mm2; WDZ-RVV 3×1.5mm2; WDZ-RVV 3×2.5mm2

  • 上一条: Wanda square
  • 下一条: Guangzhou Metro Line 3